|
Remodeling and extension of the port happening of 280 moorings to 525, besides a fishing dock with capacity for 23 boats. One has extended the dock of existing shelter and contradique towards the south in 320m and 280m respectively, both with section of dock in slope. A building of Captainship has been constructed. 10.900m2 of buildings for the commercial premises and covered parking have been constructed.
|